MS Project 2016: Progress Curve Display Issue
aureliesvc
-
Raymond PENTIER Posted messages 58207 Registration date Status Contributor Last intervention -
Raymond PENTIER Posted messages 58207 Registration date Status Contributor Last intervention -
Hello,
On MSP 2016, I want to display a progress curve on a schedule saved as a reference.
Let's take the case where all the child tasks (normal tasks) are completed at 100% by the date of my reporting (status date), ahead of their initial planning. The progress curve of these tasks is indeed shifted to the right in relation to the reporting date; however, this is not the case for the parent task (summary task of the child tasks), which does not display ahead but aligns directly with the reporting date. Its completion percentage is still 100% (since it is calculated automatically).
Have you ever encountered this display issue?
Thank you for your response.
Configuration: Windows / Chrome 84.0.4147.105
On MSP 2016, I want to display a progress curve on a schedule saved as a reference.
Let's take the case where all the child tasks (normal tasks) are completed at 100% by the date of my reporting (status date), ahead of their initial planning. The progress curve of these tasks is indeed shifted to the right in relation to the reporting date; however, this is not the case for the parent task (summary task of the child tasks), which does not display ahead but aligns directly with the reporting date. Its completion percentage is still 100% (since it is calculated automatically).
Have you ever encountered this display issue?
Thank you for your response.
Configuration: Windows / Chrome 84.0.4147.105