Filling cells based on a given date
Smiir
Posted messages
6
Status
Member
-
fabien25000 Posted messages 697 Status Member -
fabien25000 Posted messages 697 Status Member -
Hello everyone,
I have a schedule with a two-way table. On the horizontal axis, I provide the start date and the end date of the task.
On the vertical axis, I fill the cells based on the dates I have previously entered.
Thus, to speed things up and optimize the workbook, I am looking to automatically fill the cells based on the dates I provide. Is this possible? If so, please let me know how to do it as I am a bit lost with all the Excel features ^^
Thank you in advance for any help you can provide.
I have a schedule with a two-way table. On the horizontal axis, I provide the start date and the end date of the task.
On the vertical axis, I fill the cells based on the dates I have previously entered.
Thus, to speed things up and optimize the workbook, I am looking to automatically fill the cells based on the dates I provide. Is this possible? If so, please let me know how to do it as I am a bit lost with all the Excel features ^^
Thank you in advance for any help you can provide.